270 Carpenter Drive, Franklin, LA 70538
- $655,000
- 3 Beds
- 3 Full Baths
- 2,950 sq ft
- Residential
- Listing #20000982








The camp of your dreams is finally here! Enjoy everything Cypremort Point has to offer. This recently renovated 3 bedroom (7 bed,) 3 full bath camp is centrally located at the heart of The Point. Starting with your private dock, enjoy 5 easy access boat slips and a private fish cleaning station. On the ground level you will enter a set of French doors off of the marina and find a fully loaded kitchen with a gas stove, upright freezer and a versatile lounging area. Through the rolling, separating door you will find a Reel Room and a one car garage/easy storage area. On the second level, you will find a newly renovated deck, with an abundance of space to take in the waterfront views, a 2500 lb capacity elevator, and a set of french doors opening to the main living area.
For more information or to schedule a showing, call Emily Badon (337)224-1234.
Price | $655,000 |
---|---|
Bedrooms | 3 Beds |
Bathrooms | 3 Full Baths |
Property Type | Residential |
Listing # | 20000982 |
Status | Active |
Listing Type | For Sale |
Square Feet | 2,950 |
---|
Courtesy of Emily Badon, NextHome Cutting Edge Realty
Quickly estimate your monthly mortgage. If you would like a more detailed analysis of what you can afford, please inquire below.
Estimated taxes and insurance are not included. Mortgage calculator source: NextHome, Inc.