330 Le Violin Rd., Lafayette, LA 70506 | Listings

330 Le Violin Rd., Lafayette, LA 70506

  • $2,000,000
  • 3 Beds
  • 4 Full Baths
  • Year Built: 2013
  • Residential
  • Listing #22005610

Property Description

Luxury living at it's finest! Imagine a horse property centrally located in Lafayette. Includes a professionally designed and custom built home, guest home, tree house, 6 stall barn, 2 wash racks, feed room, tack room, 1/2 bath, automatic insect spray system, lighted covered and uncovered riding arenas. Main home has hardwood oak flooring and slate tile, custom built cabinets, solid wood cypress beams in the kitchen and foyer, crown molding, granite countertops, 48'' gas stove with grill, griddle and pot filler, double drawer beverage refrigerator in kitchen island, 2 fireplaces and more. A true entertainer's paradise with a wellness studio overlooking the backyard in the primary suite, gunite pool and spa with gas heater, practice tennis court as well as a fully equipped outdoor kitchen. Property is gated with 2 entrances. Security cameras throughout. 440 powdered coated fencing surrounds perimeter of property. Call today for a showing.

Listing Details

Price$2,000,000
Bedrooms3 Beds
Bathrooms4 Full Baths
Year Built2013
Property TypeResidential
Listing #22005610
StatusActive
Listing TypeFor Sale

Exterior Features

Lot Size1368 x 185 x 1368 x 224

Virtual Tour

Virtual Tour URLhttps://youtu.be/5TRdqh8VPQY

Courtesy of Shannon S. Higginbotham, NextHome Cutting Edge Realty

This content last updated on 8/9/2022 3:58 AM. Some properties which appear for sale on this web site may subsequently have sold or may no longer be available.
Schedule a Private Showing

Fill out the form below to schedule a showing.

  • Housing Occupancy

  • Rural vs. Urban

  • Market occupancy and urban/rural information from Home Junction Inc.

Community Information for Lafayette, LA 70506

  • Population Facts

    • Total Population
    • Population 5 Year Forecast
    • Population Density
    • Area Size
    • Median Population Age
    • Total Households
    • Average Household Size
    • Median Householder Age
    • Median Rent
  • Population by Age Range

  • Population by Sex

  • Population by Race

  • Highest Education Level Completed

    Education - Current Enrollment

  • Annual Household Income

    Daily Commute

  • Population Employment

  • Consumer Price Indexes

Safety in Lafayette, LA 70506

  • Crime Threat Index

Weather in Lafayette, LA 70506

  • Weather Facts

    • Daily Chance it's Sunny
    • Average Daily Sky Cover
    • Annual Days of Clear Sky
    • Annual Days of Rain
    • Annual Days of Snow
    • Annual Rain
    • Annual Snow

    Average Temperatures

  • Monthly Weather

Community information from Home Junction Inc.