107 Catholique Rd. Road, Carencro, LA 70520 | Listings

107 Catholique Rd. Road, Carencro, LA 70520

  • $1,200,000
  • 4 Beds
  • 3 Full Baths
  • 3,522 sq ft
  • Year Built: 2020
  • Residential
  • Listing #22006770

Property Description

With material shortage & prices, why build when this 3,522 sqft custom home with 832 guest house & custom 30x24 gunite pool sitting on 3 acres is move-in ready? 
 
Flood zone X
 
Lot size 177.91x725.41x177.91
 
The main house has 3,522 sqft, 4 beds & 3 full baths, and offers a must-see split floor plan.
 
The whole house has a 10-12’ varied ceiling height with a custom crown, base, and Wayne’s coating. 7 1/2 plank floors & custom tile. 
*Kitchen has custom cabinets accented with furniture bottoms, tumbled marble backsplash, custom cypress hood & 5 1/2 x 9 cypress island with 3cm leather finish slab granite. Stainless steel smart appliances. 
*Walk in Butler’s pantry with shiplap, custom cabinetry & slab granite.
*Living room with custom built-ins with granite top
*Sun/game room with floor-to-ceiling oversized wood burning fireplace, 2-6x7 windows for natural light overlooking custom 30x24 saltwater gunite pool, pavilion.
*Master bedroom & bathroom with tongue & groove cathedral ceilings. *Master closet custom designed & built for function & storage.
*Laundry room has custom cypress cabinets, with under cabinet lighting, tile backsplash & marble countertops. It connects to the master closet & is centrally located to access other bedrooms. 
*No need to worry about working from home! Office with wall-to-wall cypress built-in cabinets & marble top
?Owners had Cox cable run to the property during the building phase. It’s the only residence that offers Cox on their side of the road. The property also has AT&T fiber. 
 
?Blown in insulation in walls & attic, for low monthly utility bills 
?3 car garage with 4th oversized garage for the shop, with smart garage door openers
?270’ concrete driveway 
?Custom window treatments & blinds
?2 - 5 & 2 1/2 ton Rudd 16 seer AC units
?2 -50 gallon hot water heaters.
?Gutters 
?Custom metal awning 
?Termite treatment contract
?Pool & Hayward Equipment under 2-year warranty.
?4 live oaks planted when construction was completed
?Attic has plywood flooring over garage for plenty of storage options 
 
 
 
Guest house 
 
832 sqft 1 bed, 1 full bath
 
Waterproof Pergo laminate floors & tile throughout.
Kitchen with custom cabinets, stainless steel appliances & 3cm quartz
countertops 
The Master bath has a custom walk-in tile shower with a glass door
Laundry with washer/dryer
Also has blown in insulation in walls & attic.

--

Listing Details

Price$1,200,000
Bedrooms4 Beds
Bathrooms3 Full Baths
Year Built2020
Property TypeResidential
Listing #22006770
StatusActive
Listing TypeFor Sale

Interior Features

Square Feet3,522

Exterior Features

Lot Size3.00 acres

Virtual Tour

Virtual Tour URLhttps://www.youtube.com/embed/qT-UzQdoezM

Courtesy of Jarrid Boudreaux, NextHome Cutting Edge Realty

This content last updated on 8/9/2022 4:41 AM. Some properties which appear for sale on this web site may subsequently have sold or may no longer be available.
Schedule a Private Showing

Fill out the form below to schedule a showing.

  • Housing Occupancy

  • Rural vs. Urban

  • Market occupancy and urban/rural information from Home Junction Inc.

Community Information for Carencro, LA 70520

  • Population Facts

    • Total Population
    • Population 5 Year Forecast
    • Population Density
    • Area Size
    • Median Population Age
    • Total Households
    • Average Household Size
    • Median Householder Age
    • Median Rent
  • Population by Age Range

  • Population by Sex

  • Population by Race

  • Highest Education Level Completed

    Education - Current Enrollment

  • Annual Household Income

    Daily Commute

  • Population Employment

  • Consumer Price Indexes

Safety in Carencro, LA 70520

  • Crime Threat Index

Weather in Carencro, LA 70520

  • Weather Facts

    • Daily Chance it's Sunny
    • Average Daily Sky Cover
    • Annual Days of Clear Sky
    • Annual Days of Rain
    • Annual Days of Snow
    • Annual Rain
    • Annual Snow

    Average Temperatures

  • Monthly Weather

Community information from Home Junction Inc.