24856 Lazy Lane, Elberta, AL 36530 | Listings

24856 Lazy Lane, Elberta, AL 36530

  • $885,000
  • 5 Beds
  • 3 Full Baths
  • 2,892 sq ft
  • Year Built: 2019
  • Residential
  • Listing #336320

Property Description

Beautifully maintained custom built 5 bedroom, 3 bath home with an additional bonus room. This home is Gold Fortified and sits on 14 acres in a quiet area of Elberta. Enjoy relaxing on the back porch or screened in patio overlooking the property and inground salt water pool. When entering the home you will notice the high ceilings and open floor plan. The home boasts stained concrete flooring, custom built cabinets throughout the kitchen, granite countertops and walk-in pantry. The kitchen is equipped with black stainless steel appliances, large farm sink and subway tile backsplash. The master suite has a large walk-in closet with custom built shelving, soaking tub and large separate shower. There are 2 additional bedrooms downstairs and 2 bedrooms and one full bath upstairs with an additional bonus room. Downstairs you will find a mudroom with a built-in bench with multiple storage spaces. HVAC system has three zones (2 upstairs and one downstairs), spray foam insulation and a double septic tank. There is also a 40x60 storage building with 600 sf. as well as insulated heated and cooled with a loft. This beauty will not last long, schedule a showing today.

Listing Details

Price$885,000
Bedrooms5 Beds
Bathrooms3 Full Baths
Year Built2019
Property TypeResidential
Listing #336320
StatusActive
Listing TypeFor Sale

Interior Features

Square Feet2,892

Exterior Features

Lot Size14.00 acres

Courtesy of Taura Domingue, NextHome Sunset Realty

This content last updated on 9/24/2022 4:01 PM. Some properties which appear for sale on this web site may subsequently have sold or may no longer be available.
Schedule a Private Showing

Fill out the form below to schedule a showing.

  • Housing Occupancy

  • Rural vs. Urban

  • Market occupancy and urban/rural information from Home Junction Inc.

Community Information for Elberta, AL 36530

  • Population Facts

    • Total Population
    • Population 5 Year Forecast
    • Population Density
    • Area Size
    • Median Population Age
    • Total Households
    • Average Household Size
    • Median Householder Age
    • Median Rent
  • Population by Age Range

  • Population by Sex

  • Population by Race

  • Highest Education Level Completed

    Education - Current Enrollment

  • Annual Household Income

    Daily Commute

  • Population Employment

  • Consumer Price Indexes

Safety in Elberta, AL 36530

  • Crime Threat Index

Weather in Elberta, AL 36530

  • Weather Facts

    • Daily Chance it's Sunny
    • Average Daily Sky Cover
    • Annual Days of Clear Sky
    • Annual Days of Rain
    • Annual Days of Snow
    • Annual Rain
    • Annual Snow

    Average Temperatures

  • Monthly Weather

Community information from Home Junction Inc.